Step 1

Project and contact

Identify the site and project stage.

Maximum 10 MB. Larger drawing packages can be provided after review.

Step 2

Mechanical system overview

Describe the equipment and areas that require control.

Step 3

Equipment and points in scope

Select the primary systems and control functions.

Step 4

Sequences, alarms and integration

Define how operators should use and support the HVAC controls.

Step 5

Review the HVAC controls scope

Confirm the equipment, operating intent and technical information available.

Preliminary scope

Scope review ready

Your answers will be organized into a concise preliminary scope for Luna Controls review.

This tool establishes scope and coordination requirements. It is not a final engineered design, sequence of operation, quotation or construction document.